civil engineering
NYS 52,52A &17B
GUIDE RAIL, SULLIVAN COUNTY NY, $6.000 M
Mr. Doak, as project manager, lead the design team through the complex village main street reconstruction project. In addition to all the features common to a village project as noted above, this project was also complicated by steep terrain, a very tight ROW corridor, and complicated intersections. Mr. Doak was the first to introduce roundabouts to NYSDOT Region 9 by replacing two of the troubled intersections with them.

location: Sullivan County

STERLING BRIDGE

CHENANGO STREET SIDEWALK

BRIDGEWATER LOADING DOCK

Richfield Springs

NYS 30, RECONSTRUCTION, MIDDLEBURG, NY, $3.000 M

NYS 17C, JOHNSON CITY, MILL/FILL & SIDEWALK, NY, $6.000 M

NYS 96/CATATONK CREEK, BRIDGE, CANDOR, NY, $5.000 M

NYS 52,52A &17B, GUIDE RAIL, SULLIVAN COUNTY NY, $6.000 M

NYS 52 & 52A RECONSTRUCTION, LIBERTY NY, $12.000 M

NYS 26 & 17C RECONSTRUCTION, ENDICOTT

LALOR FAMILY DENTAL, Big Flats, NY

Mudge Student Housing Complex

NYSDOT SOUTHERN WELCOME CENTER

Vestal Volunteer Emergency Squad

The India Cultural Centre

Muench Orthodontics
